High-Arch Air Dome Training Center in China - Top Suppliers & Factory for PVDF Membrane Structures
Parameters
| Name | High-arch Air Dome Training Center |
| Area | 3000㎡ |
| Material | PVDF Polyester Membrane (Class B1 Fire Retardant) |
| Ridge Height | 16m |
| Build Time | 6 Days (installation & testing included) |
| Wind Resistance | Level 12 |
| Temperature | -40℃~60℃ |
| Lifespan | >25 Years (with Normal Maintenance) |
Details
The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
The air supported structure is disassembled and reassembled. The large space can be quickly switched to different usage scenarios. It can be used as a daily professional training base or transformed into a temporary performance stage, making it multi-functional.






