Leave Your Message
High-arch Air Dome Training Center
Event Air Domes

High-arch Air Dome Training Center

This 3,000-square-meter air-supported training center dome, constructed from PVDF membrane material, stands 16 meters tall and features integrated lighting and a constant-temperature fresh-air system. Located in Hualong District, Puyang City, Henan Province, it has been operating stably for seven years.

    Parameters

    Name

    High-arch Air Dome Training Center

    Area

    3000㎡

    Material

    PVDF Polyester Membrane (Class B1 Fire Retardant)

    Ridge Height

    16m

    Build Time

    6 Days (installation & testing included)

    Wind Resistance

    Level 12

    Temperature

    -40℃~60℃

    Lifespan

    >25 Years (with Normal Maintenance)

    Details

    • Air Dome Training Hall Floor-standing Light Poles

      Air Dome Training Hall Floor-standing Light Poles

      The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
    • Airtight Entrance of the Air Dome

      Airtight Entrance of the Air Dome

      The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
    • High-dynamic Training inside Air Dome

      High-dynamic Training inside Air Dome

      The 3,000-square-meter air-supported membrane acrobatics training hall built for Henan Acrobatics Group, with dimensions of 70m×40m and a height of 16m, is located in Hualong District, Puyang City. It has been in stable operation for 7 years and has received high praise from the trainees. The venue adopts floor-standing pole floodlighting, with the lights distributed from bottom to top, fully releasing the high-altitude training space on the upper part of the venue.
    • Elevated Props inside Air Dome

      Elevated Props inside Air Dome

      The air supported structure is disassembled and reassembled. The large space can be quickly switched to different usage scenarios. It can be used as a daily professional training base or transformed into a temporary performance stage, making it multi-functional.

    Other Advantages

    Modular prefabrication, rapid assembly, efficient and flexible deployment.
    High-strength PVDF membrane, tensile-resistant, wear-resistant, weather-resistant, safe and durable.

    Application Scenarios

    • Tailored for Performing Arts Enterprises: Establishing Professional Training & Sports Bases to Boost Team Readiness.
    • Sports Venue Operators: Can create high-clearance sports venues with rapid capacity expansion and low investment costs.
    • Event & Concert Organizers: Provides temporary venues that can be quickly assembled and dismantled for activities requiring high ceilings or extensive vertical space, allowing for reuse after the event.

    FAQ

    Q1: Are there safety concerns with air domes during heavy wind and rainstorms?
    A1: No. The membrane material has high strength and is equipped with a stormwater drainage system. It can withstand force 12 winds and magnitude 8 earthquakes, ensuring normal operation even during severe weather conditions.
    Q2: How large of a team is needed to install a 3,000 sqm air dome venue?
    A2: Only 7-9 people are required. Since all components are prefabricated in the factory, the on-site work only involves inflation and anchoring. The entire process can be completed in just 4 to 8 days.
    Q3: Is the construction cost of a High-arch Air Dome high?
    A3: No. On-site construction does not require complex foundation engineering, so it costs less than 40% of what traditional construction projects would require.
    SEND A MESSAGE